License: Creative Commons Attribution 3.0 Unported license (CC BY 3.0)
When quoting this document, please refer to the following
DOI: 10.4230/LIPIcs.ISAAC.2020.18
URN: urn:nbn:de:0030-drops-133620
URL: http://dagstuhl.sunsite.rwth-aachen.de/volltexte/2020/13362/
Koutecký, Martin ;
Zink, Johannes
Complexity of Scheduling Few Types of Jobs on Related and Unrelated Machines
Abstract
The task of scheduling jobs to machines while minimizing the total makespan, the sum of weighted completion times, or a norm of the load vector, are among the oldest and most fundamental tasks in combinatorial optimization. Since all of these problems are in general NP-hard, much attention has been given to the regime where there is only a small number k of job types, but possibly the number of jobs n is large; this is the few job types, high-multiplicity regime. Despite many positive results, the hardness boundary of this regime was not understood until now.
We show that makespan minimization on uniformly related machines (Q|HM|C_max) is NP-hard already with 6 job types, and that the related Cutting Stock problem is NP-hard already with 8 item types. For the more general unrelated machines model (R|HM|C_max), we show that if either the largest job size p_max, or the number of jobs n are polynomially bounded in the instance size |I|, there are algorithms with complexity |I|^poly(k). Our main result is that this is unlikely to be improved, because Q||C_max is W[1]-hard parameterized by k already when n, p_max, and the numbers describing the speeds are polynomial in |I|; the same holds for R|HM|C_max (without speeds) when the job sizes matrix has rank 2. Our positive and negative results also extend to the objectives ?₂-norm minimization of the load vector and, partially, sum of weighted completion times ∑ w_j C_j.
Along the way, we answer affirmatively the question whether makespan minimization on identical machines (P||C_max) is fixed-parameter tractable parameterized by k, extending our understanding of this fundamental problem. Together with our hardness results for Q||C_max this implies that the complexity of P|HM|C_max is the only remaining open case.
BibTeX - Entry
@InProceedings{kouteck_et_al:LIPIcs:2020:13362,
author = {Martin Kouteck{\'y} and Johannes Zink},
title = {{Complexity of Scheduling Few Types of Jobs on Related and Unrelated Machines}},
booktitle = {31st International Symposium on Algorithms and Computation (ISAAC 2020)},
pages = {18:1--18:17},
series = {Leibniz International Proceedings in Informatics (LIPIcs)},
ISBN = {978-3-95977-173-3},
ISSN = {1868-8969},
year = {2020},
volume = {181},
editor = {Yixin Cao and Siu-Wing Cheng and Minming Li},
publisher = {Schloss Dagstuhl--Leibniz-Zentrum f{\"u}r Informatik},
address = {Dagstuhl, Germany},
URL = {https://drops.dagstuhl.de/opus/volltexte/2020/13362},
URN = {urn:nbn:de:0030-drops-133620},
doi = {10.4230/LIPIcs.ISAAC.2020.18},
annote = {Keywords: Scheduling, cutting stock, hardness, parameterized complexity}
}
Keywords: |
|
Scheduling, cutting stock, hardness, parameterized complexity |
Collection: |
|
31st International Symposium on Algorithms and Computation (ISAAC 2020) |
Issue Date: |
|
2020 |
Date of publication: |
|
04.12.2020 |